The Bristol Springs Green Hydrogen Project is located 120 km from Perth in the South West of Western Australia and is on track to become one of the first, low cost green hydrogen projects in Australia.
The Company completed a Pre-Feasibility Study on the Project in 2022 which found that Stage One (114MW solar farm) would produce approximately 4.4 million kilograms of green hydrogen per annum.
GGC have been carrying out a staged approach to the geotechnical investigations as the project transitions through various phases. So far we’ve carried out a desktop study for pre-purchase and geotechnical and geophysical investigations for preliminary foundation and infrastructure design.
CPT probing
Test pitting
Wenner-array testing
Thermal conductivity and Resistivity testing
Infiltration testing
Foundation condition assessment
Excavatability assessment
Provision of Electrical and thermal resistivity/conductivity parameters
Permeability assessment
Learn more about the project here.
GGC is providing geotechnical support to a growing number of Renewable Energy Infrastructure projects across Australia including solar farms, wind farms, and green hydrogen hubs.
Please get in touch with Ian Rogers if you require any geotechnical input on existing or upcoming projects.